Some infrastructure or renewable energy (RE) projects β ground-mounted photovoltaic (solar PV) plants, wind farms, methanisation units, geothermal projects, ICPE facilities, industrial or logistics zones β start at the local level, long before the publication of a public tender.
Local authorities remain one of the earliest and most reliable sources of project information.
β
β
Minutes from municipal and community councils often reveal that a local authority intends to create a business zone, release land for a solar PV project, study the possibility of a wind farm, authorise a methanisation unit, or enter into an energy-development partnership. These decisions are the first concrete signals that an energy or infrastructure project is emerging.
β
β
Initial budgets, administrative accounts and financial plans clearly show: allocated funding, financed studies and planned investments.
When a project appears in a budget line, it generally means it has passed a significant political and financial milestone.
β
β
Before launching construction, local authorities commission environmental studies, energy assessments, technical feasibility studies and AMO/owner-support missions. These often represent the first operational stage of a PV, wind, ICPE or industrial project.
β
β
β
Private renewable energy and infrastructure projects (solar PV, wind, methanisation, ICPE, industrial projects) must comply with mandatory regulatory procedures whenever environmental impact is significant.
These regulatory steps generate extremely early public data, often visible 12 to 24 months before any procurement.
β
β
All private developers must submit a dossier to the Environmental Authority. These filings contain:
In practice, this is the most exhaustive map of Franceβs private renewable energy pipeline, available well before any work contracts or tenders.
For tier-N-1 suppliers (engineering, geotechnics, topography, EPC contractors, safety providers, equipment suppliers, civil works or grid-connection companies), this data enables early positioning and business anticipation.
β
β
The MRAe systematically publish case-by-case examination requests, impact studies, developer dossiers and formal opinions. For a PV or wind project, these documents detail capacity, land use, environmental impacts, footprint, technical design and schedule β among the earliest and most precise information available.
β
Most projects submitted to the Environmental Authority will:
However, all filings remain strategically valuable as they allow stakeholders to:
β
β
Public inquiries β mandatory for impactful energy or industrial projects β offer complete files (plans, studies, analyses, constraints). This information often exceeds what will later appear in tenders.
β
β
Submitting a building permit or ICPE authorisation indicates advanced project maturity. Developers frequently begin seeking partners at this stage.
β
β
β
Public tenders are a major source of opportunities, but their value depends heavily on project size.
β
β
For large-scale photovoltaic parks, wind farms, industrial methanisation units or complex logistics developments, discovering a project when the tender is published usually means:
Early detection through local decisions, MRAe filings or ICPE dossiers is essential.
β
β
For more modest projects β PV parking carports, rooftop solar on public buildings, small installations, municipal energy improvements, calls for expressions of interest (CEI/AMI), maintenance works β public tenders remain an excellent commercial entry point.
In these cases, responding at the time of publication is not too late because the authority is genuinely seeking candidates.
β
β
The RE sector is experiencing instability:
Private investment slows down, and both B2C and private B2B markets may contract.
Public tenders thus become essential for maintaining stable revenue, securing recurring contracts and diversifying clients.
In summary:
β
β
β
Award notices reveal the winning company, contract value, scope and timeline.
A company that has just won an energy contract (PV EPC, wind AMO, industrial zone development, grid works) immediately needs subcontractors, suppliers, engineering support or equipment.
This makes award notices one of the most powerful tools to generate B2B opportunities.
β
β
To detect energy and infrastructure projects early, monitor:
β
β

β
β
β
The energy sector β particularly solar PV β is experiencing volatility that significantly affects project planning.
β
β
Frequent regulatory changes, fluctuating feed-in tariffs, revisions of CRE tender frameworks and uncertainty around ICPE rules make long-term planning difficult. Developers hesitate to invest heavily until the framework stabilises.
β
β
Unpredictable and unstable incentives (MaPrimeRΓ©novβ, self-consumption bonuses, reduced VAT, feed-in tariffs) slow household adoption, destabilising installers and SMEs.
Opportunities remain abundant, but the context demands constant regulatory monitoring and early project detection.
β
Success in Franceβs energy and infrastructure markets (solar PV, wind, methanisation, ICPE, geothermal) requires monitoring weak signals, regulatory filings, local decisions and award notices. Tenders are only one part of the cycle: companies that detect projects 12β24 months in advance influence design, connect early with key actors and ultimately win contracts.