How to Identify Opportunities in Energy Infrastructure in France?

‍

1. Local Decisions as Early Indicators of Energy & Infrastructure Projects (Photovoltaics, Wind Power, Methanisation, Geothermal Energy, ICPE Projects)

‍

Some infrastructure or renewable energy (RE) projects β€” ground-mounted photovoltaic (solar PV) plants, wind farms, methanisation units, geothermal projects, ICPE facilities, industrial or logistics zones β€” start at the local level, long before the publication of a public tender.

Local authorities remain one of the earliest and most reliable sources of project information.

‍

Municipal or Community Council Deliberations

‍

Minutes from municipal and community councils often reveal that a local authority intends to create a business zone, release land for a solar PV project, study the possibility of a wind farm, authorise a methanisation unit, or enter into an energy-development partnership. These decisions are the first concrete signals that an energy or infrastructure project is emerging.

‍

Budgets and Multi-Year Planning Documents

‍

Initial budgets, administrative accounts and financial plans clearly show: allocated funding, financed studies and planned investments.
When a project appears in a budget line, it generally means it has passed a significant political and financial milestone.

‍

Preliminary Study Contracts

‍

Before launching construction, local authorities commission environmental studies, energy assessments, technical feasibility studies and AMO/owner-support missions. These often represent the first operational stage of a PV, wind, ICPE or industrial project.

‍

‍

2. Regulatory Signals: Mandatory Filings with MRAe, ICPE Dossiers & Public Inquiries for Photovoltaic, Wind and Industrial Projects

‍

Private renewable energy and infrastructure projects (solar PV, wind, methanisation, ICPE, industrial projects) must comply with mandatory regulatory procedures whenever environmental impact is significant.

These regulatory steps generate extremely early public data, often visible 12 to 24 months before any procurement.

‍

Environmental Filings: A Strategic Source for the French Renewable Energy Market

‍

All private developers must submit a dossier to the Environmental Authority. These filings contain:

  • the complete list of ongoing projects;
  • technical characteristics: capacity, surface area, number of units, footprint;
  • the developer responsible;
  • precise location;
  • stage of advancement;
  • completed studies;
  • identified environmental constraints.

In practice, this is the most exhaustive map of France’s private renewable energy pipeline, available well before any work contracts or tenders.

For tier-N-1 suppliers (engineering, geotechnics, topography, EPC contractors, safety providers, equipment suppliers, civil works or grid-connection companies), this data enables early positioning and business anticipation.

‍

Regional Environmental Authority (MRAe) Opinions

‍

The MRAe systematically publish case-by-case examination requests, impact studies, developer dossiers and formal opinions. For a PV or wind project, these documents detail capacity, land use, environmental impacts, footprint, technical design and schedule β€” among the earliest and most precise information available.

‍

⚠ Only About 30% of Submitted Projects Reach Completion

Most projects submitted to the Environmental Authority will:

  • never be built,
  • be rejected by the administration,
  • be abandoned for economic reasons,
  • or be blocked by grid or local constraints.

However, all filings remain strategically valuable as they allow stakeholders to:

  • identify active competitors,
  • observe environmental expectations,
  • analyse RE market trends,
  • anticipate developer needs,
  • prepare their own dossiers more effectively.

‍

Public Inquiries

‍

Public inquiries β€” mandatory for impactful energy or industrial projects β€” offer complete files (plans, studies, analyses, constraints). This information often exceeds what will later appear in tenders.

‍

Building Permits and ICPE Authorisations

‍

Submitting a building permit or ICPE authorisation indicates advanced project maturity. Developers frequently begin seeking partners at this stage.

‍

‍

3. Public Tenders: Too Late for Large RE Projects, but Essential for Medium-Scale Solar PV Installations and Under Today’s Renewable Energy Market Conditions

‍

Public tenders are a major source of opportunities, but their value depends heavily on project size.

‍

For Large Energy & Infrastructure Projects, Tenders Arrive Too Late

‍

For large-scale photovoltaic parks, wind farms, industrial methanisation units or complex logistics developments, discovering a project when the tender is published usually means:

  • studies are completed,
  • key partners are identified,
  • strategy is set,
  • manoeuvring room is limited.

Early detection through local decisions, MRAe filings or ICPE dossiers is essential.

‍

For Smaller Projects, Public Tenders Remain Highly Relevant

‍

For more modest projects β€” PV parking carports, rooftop solar on public buildings, small installations, municipal energy improvements, calls for expressions of interest (CEI/AMI), maintenance works β€” public tenders remain an excellent commercial entry point.

In these cases, responding at the time of publication is not too late because the authority is genuinely seeking candidates.

‍

In Today’s Unstable Renewable Energy Context, Monitoring Public Tenders Is Vital

‍

The RE sector is experiencing instability:

  • fluctuating regulations,
  • uncertain feed-in tariffs,
  • lack of visibility for developers,
  • unpredictable residential incentives.

Private investment slows down, and both B2C and private B2B markets may contract.

Public tenders thus become essential for maintaining stable revenue, securing recurring contracts and diversifying clients.

In summary:

  • Large projects: too late at tender stage.
  • Medium-scale projects: tenders are one of the best entry points.
  • Current context: tracking public tenders is indispensable.

‍

‍

4. Contract Award Notices: A Strategic Tool to Target Winning Companies and Generate B2B Opportunities

‍

Award notices reveal the winning company, contract value, scope and timeline.
A company that has just won an energy contract (PV EPC, wind AMO, industrial zone development, grid works) immediately needs subcontractors, suppliers, engineering support or equipment.

This makes award notices one of the most powerful tools to generate B2B opportunities.

‍

5. Summary: The Five Essential Sources for Detecting Energy & Infrastructure Projects Early in France

‍

To detect energy and infrastructure projects early, monitor:

  • Local political decisions (deliberations, budgets, strategic plans).
  • Regulatory signals (MRAe opinions, ICPE filings, public inquiries, impact studies).
  • Administrative formalities (building permits, ICPE submissions).
  • Public tenders (useful for tracking execution phases).
  • Contract awards (to contact winning companies immediately).

‍

‍

‍

‍

Current Instability in the French Renewable Energy Sector: A Crucial Context

‍

The energy sector β€” particularly solar PV β€” is experiencing volatility that significantly affects project planning.

‍

Legal and Regulatory Instability for RE Developers

‍

Frequent regulatory changes, fluctuating feed-in tariffs, revisions of CRE tender frameworks and uncertainty around ICPE rules make long-term planning difficult. Developers hesitate to invest heavily until the framework stabilises.

‍

Uncertain Incentives in the Residential Sector

‍

Unpredictable and unstable incentives (MaPrimeRΓ©nov’, self-consumption bonuses, reduced VAT, feed-in tariffs) slow household adoption, destabilising installers and SMEs.

Opportunities remain abundant, but the context demands constant regulatory monitoring and early project detection.

‍

Conclusion: Detecting Projects Early: Competitive Advantage

Success in France’s energy and infrastructure markets (solar PV, wind, methanisation, ICPE, geothermal) requires monitoring weak signals, regulatory filings, local decisions and award notices. Tenders are only one part of the cycle: companies that detect projects 12–24 months in advance influence design, connect early with key actors and ultimately win contracts.

To gain full visibility over all these public tenders, weak signals, municipal decisions, environmental filings and public inquiries, you can rely on our DeepBloo platform β€” and request a demo anytime.

‍

‍